Detailing > Elevations Menu > Elevations

Elevations

 

Frame Elevations tab

 

Note: When drawing a 3-sided frame for submittal, be sure Costing Method is set to Automatic. For Elevations, be sure Costing Method is Elevations.

 

Costing Method

  1. To change Costing Method, left click in Costing Method box.
  2. Click on arrow.
  3. Hilight selection.

  4. Red field in Price column indicates an Elevation has not been priced or needs to be re-validated.

 

 Door Elevations and Kits tab

 Add Lite Kit to Door

  1. Click on Door Elevations & Kits tab.
  2. Double click on Lite/Lvr Kits field.

 

Enter Lite attributes

  1. Double click in Kits Prep & Part List field to bring up list of options.

  2. Select lite kit and any labor functions.
  3. Left click and drag to box at right, or click on Add button.

  4. Above is the Completed Entry.

 

Save to Library

 

Continue to Draw an Elevation